<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Q Technical Services (UK) Ltd &#187; Boom Lift</title>
	<atom:link href="http://www.qgroup.uk.com/blog/tag/boom-lift/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.qgroup.uk.com/blog</link>
	<description>There when you need us</description>
	<lastBuildDate>Fri, 03 Feb 2012 07:22:55 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>Energy Saving Lighting to Shopping Centre Mall</title>
		<link>http://www.qgroup.uk.com/blog/energy-saving-lighting-to-shopping-centre-mall/</link>
		<comments>http://www.qgroup.uk.com/blog/energy-saving-lighting-to-shopping-centre-mall/#comments</comments>
		<pubDate>Thu, 17 Nov 2011 09:35:20 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Latest News]]></category>
		<category><![CDATA[Boom Lift]]></category>
		<category><![CDATA[Consumption]]></category>
		<category><![CDATA[Engineer]]></category>
		<category><![CDATA[Fire Alarm]]></category>
		<category><![CDATA[Fixed Cost]]></category>
		<category><![CDATA[General Lighting]]></category>
		<category><![CDATA[Globe Lighting]]></category>
		<category><![CDATA[Lamp Life]]></category>
		<category><![CDATA[Lamp Units]]></category>
		<category><![CDATA[Lamps]]></category>
		<category><![CDATA[Latest Technology]]></category>
		<category><![CDATA[Lighting Repair]]></category>
		<category><![CDATA[Maintenance Costs]]></category>
		<category><![CDATA[Man Team]]></category>
		<category><![CDATA[Mileage]]></category>
		<category><![CDATA[Mileage Charge]]></category>
		<category><![CDATA[Nbsp]]></category>
		<category><![CDATA[Reduced Energy]]></category>
		<category><![CDATA[Shopping Centre]]></category>
		<category><![CDATA[Shopping Mall]]></category>

		<guid isPermaLink="false">http://www.qgroup.uk.com/blog/?p=243</guid>
		<description><![CDATA[FACT: Did you know that we have now set a fixed cost maintenance rate for all servicing and maintenance call outs; to general lighting repair to a fully qualified fire alarm engineer. £31.00 per hour for single engineer and £47.40 per hour if a two man team required. NO CALL OUT CHARGE/NO MILEAGE CHARGE. Just [...]]]></description>
			<content:encoded><![CDATA[<p>FACT: Did you know that we have now set a fixed cost maintenance rate for all servicing and maintenance call outs; to general lighting repair to a fully qualified fire alarm engineer. £31.00 per hour for single engineer and £47.40 per hour if a two man team required. NO CALL OUT CHARGE/NO MILEAGE CHARGE. Just one flat rate. For all your requirements simply contact our helpdesk at <a href="mailto:helpdesk@qgroup.uk.com">helpdesk@qgroup.uk.com</a> or call the office 01952 670020.</p>
<p>&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8211;</p>
<p>The owner of a shopping centre was aware that the existing globe lighting illuminating their mall area was failing with none operational lamps and ageing control gear.</p>
<p><a href="http://www.qgroup.uk.com/blog/energy-saving-lighting-to-shopping-centre-mall/sony-dsc-2/" rel="attachment wp-att-244"><img class="alignnone size-medium wp-image-244" title="Before with our access lift in place" src="http://www.qgroup.uk.com/blog/wp-contents/uploads/Before-with-lift-200x300.jpg" alt="" width="200" height="300" /></a></p>
<p>With the assistance of Q Technical and using our own access boom lift we have successfully removed all of the 14 old 80watt MBFU lamp and aging control gear and installed into each of them Megaman&#8217;s 60Watt energy saving cluster lamp units.</p>
<p>This has provided the client with reduced energy saving costs of 420watts of consumption per hour and a manufacturers lamp life of 15,000 hours</p>
<p><a href="http://www.qgroup.uk.com/blog/energy-saving-lighting-to-shopping-centre-mall/sony-dsc-3/" rel="attachment wp-att-245"><img class="alignnone size-medium wp-image-245" title="What a difference a night shift makes" src="http://www.qgroup.uk.com/blog/wp-contents/uploads/After-300x200.jpg" alt="" width="300" height="200" /></a></p>
<p>Q Technical Services &#8211; Using the latest technology to save energy and maintenance costs.</p>
<p>INSTALLATIONS      MAINTENANCE      SERVICING</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.qgroup.uk.com/blog/energy-saving-lighting-to-shopping-centre-mall/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Powered Access upto 12.2 metres</title>
		<link>http://www.qgroup.uk.com/blog/powered-access-upto-122-metres/</link>
		<comments>http://www.qgroup.uk.com/blog/powered-access-upto-122-metres/#comments</comments>
		<pubDate>Tue, 25 Nov 2008 11:37:32 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Latest News]]></category>
		<category><![CDATA[2m]]></category>
		<category><![CDATA[Array]]></category>
		<category><![CDATA[Axles]]></category>
		<category><![CDATA[Boom Lift]]></category>
		<category><![CDATA[CCTV]]></category>
		<category><![CDATA[Chassis]]></category>
		<category><![CDATA[Compact Base]]></category>
		<category><![CDATA[Compact Chassis]]></category>
		<category><![CDATA[Double Doors]]></category>
		<category><![CDATA[Emergencies]]></category>
		<category><![CDATA[Finance Deal]]></category>
		<category><![CDATA[Fleet]]></category>
		<category><![CDATA[High Level Lighting]]></category>
		<category><![CDATA[High Level Lighting Repairs]]></category>
		<category><![CDATA[Installations]]></category>
		<category><![CDATA[Leasing Company]]></category>
		<category><![CDATA[Level Lighting]]></category>
		<category><![CDATA[Lighting]]></category>
		<category><![CDATA[Lighting Maintenance]]></category>
		<category><![CDATA[Lighting Repairs]]></category>
		<category><![CDATA[Maximum Performance]]></category>
		<category><![CDATA[Nifty]]></category>
		<category><![CDATA[Outreach]]></category>
		<category><![CDATA[Outriggers]]></category>
		<category><![CDATA[Powered Access]]></category>
		<category><![CDATA[Q Technical Services]]></category>
		<category><![CDATA[Telescopic Boom]]></category>
		<category><![CDATA[Tower Leasing]]></category>
		<category><![CDATA[Uk Ltd]]></category>
		<category><![CDATA[Winning Team]]></category>
		<category><![CDATA[Working At Height]]></category>

		<guid isPermaLink="false">http://www.qgroup.uk.com/blog/?p=36</guid>
		<description><![CDATA[Q Technical Services (UK) Ltd is please to have aquired its very own Nifty Lift 120T 12.2metre Battery powered trailer boom lift. This machine allows Q Technical Services (UK) Ltd to quickly deploy a fully trained IPAF operative to deal with building high level emergencies/repairs, high level lighting repairs and CCTV maintenance. The machine also [...]]]></description>
			<content:encoded><![CDATA[<div>
<p><a href="http://www.qgroup.uk.com/blog/powered-access-upto-122-metres/external-lighting/" rel="attachment wp-att-194"><img class="alignleft size-medium wp-image-194" title="Powered access up to 12.2 Metres " src="http://www.qgroup.uk.com/blog/wp-contents/uploads/External-Lighting-290x300.jpg" alt="" width="290" height="300" /></a>Q Technical Services (UK) Ltd is please to have aquired its very own Nifty Lift 120T 12.2metre Battery powered trailer boom lift.</p>
<p>This machine allows Q Technical Services (UK) Ltd to quickly deploy a fully trained IPAF operative to deal with building high level emergencies/repairs, high level lighting repairs and CCTV maintenance.</p>
</div>
<div>The machine also allows us to comply with working at height regulations when carrying out such maintenance and installation works which involve high level working.</div>
<div></div>
<div>The machine is designed to be use in external locations and in some industrial and selected commercial internal locations where access is available. The machine width closes to 1.5metres (Passable through a pair of double doors).</div>
<div style="line-height: normal;">Designed specifically to give maximum performance from the most compact chassis possible, the Nifty 120T utilises its versatile telescopic boom to deliver unrivalled working outreach of 6.1metres.</div>
<div style="line-height: normal;">Hydraulically operated outriggers make set up quick and easy and telescopic axles coupled with a compact base make this one of the most manoeuvrable 12.2m trailer mounts available.</div>
<div style="line-height: normal;">If you require any further information or the services of speed to access and repair your high level issues do not hesitate to contact us.</div>
]]></content:encoded>
			<wfw:commentRss>http://www.qgroup.uk.com/blog/powered-access-upto-122-metres/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

